Special Permit, 27 Marshland St

Tuesday, October 20, 2026 at 7:00 PM

Doc 21-J- CCSP-26-7 –Matt Silva for Sterling Commonwealth Builders requests approval to demolish existing single-family residence and construct three (3) attached townhouse condominium units on a single parcel at 27 Marshland St in the RH (Residential High) Zone. Each unit is proposed to contain three (3) bedrooms, 2 and one-half bathrooms, and an attached two-car garage


Concerns raised in review, and the applicant’s answers

The neighbourhood

Concern

Mark Dickinson, (copied on this email) a property owner on Marshland Street, contacted the Council Office this afternoon regarding the special permit for 27 Marshland Street.

Mr. Dickinson wanted you to be aware there is tremendous opposition to this project within the neighborhood.

Lori A. Robertson, Administrative Assistant, Haverhill City Council, September 14, 2026, PDF, opens in a new tab

Answer

In addition to the required legal notice, the Applicant sent out mailings to property owners in the neighborhood detailing the Project plans and providing contact information if there were any concerns about the Project. The Applicant also went door-to-door the weekend of October 3-4, 2026, and spoke with several neighbors about the Project. Most were overall supportive of the project, but concerns about the availability of on-street parking were also communicated.

Jonathan R. Stark-Sachs, Johnson & Borenstein, LLC, October 15, 2026, PDF, opens in a new tab

Driveway spacing and front-yard coverage

Concern

The alignment of the townhouses, and subsequent driveways is prohibited by Section 6.1.11.3. The proposed driveways take almost 100% of the front yard. Per code they cannot exceed 50% of the front yard,

Any two driveways leading to or from a street to or from a single lot shall not be within 30 feet of each other at their intersections with the front lot line.

Lisa E. DeMeo, P.E., City Engineer, July 24, 2026, PDF, opens in a new tab

Answer

Should the Council grant the special permit, the Applicant therefore plans to seek a variance from the Haverhill Zoning Board of Appeals to allow for greater driveway coverage and closer spacing than normally allowed by the Ordinance.

Jonathan R. Stark-Sachs, Johnson & Borenstein, LLC, October 15, 2026, PDF, opens in a new tab

On-street parking

Concern

The proposed driveways are taking on street parking away from all abutters.

Lisa E. DeMeo, P.E., City Engineer, July 24, 2026, PDF, opens in a new tab

Answer

The Project provides for three separate driveways and two-car garages to serve each proposed townhome, supporting up to four parking spaces for residents and guests of each unit.

The Applicant believes that the ample off-street parking provided, which will not result in any additional on-street parking demand, addresses this concern.

Jonathan R. Stark-Sachs, Johnson & Borenstein, LLC, October 15, 2026, PDF, opens in a new tab

Stormwater

Concern

Could you please provide a civil plan demonstrating compliance with the design standards found under C. 255, s. 6.3.3. I particularly review for compliance with 6.3.3.3, .4, and .5.

Robert E. Moore, Jr., Storm Water Review, July 21, 2026, PDF, opens in a new tab

1/2" Storm Requirements

Driveway Drainage Concerns

City comments, as the applicant’s engineer restates them, PDF, opens in a new tab

Answer

Each townhome will be provided with separate stormwater management infrastructure, and pavement in both the front and rear has been reduced and pitched to provide for managed stormwater runoff, along with other minor changes to utility placement.

Jonathan R. Stark-Sachs, Johnson & Borenstein, LLC, October 15, 2026, PDF, opens in a new tab

Please see attached plan which shows drainage calculations for the 1/2-inch storm.

The proposed driveways are to be crowned draining towards 12”x24” french drains that will run along both edges of the driveway to mitigate storm runoff.

Daniel Dragani, P.E., Engineering Solutions Group, October 13, 2026, PDF, opens in a new tab

Depth to the seasonal high water table

Answer

The plan has been revised to now show the test pit data along with additional grading. Subsequently, the proposed stormtech systems each have a minimum of 2ft separation from ESGHWT to bottom of stone.

Daniel Dragani, P.E., Engineering Solutions Group, October 13, 2026, PDF, opens in a new tab

Impervious coverage

Answer

Engineering Solutions Group does not perform zoning related work. Nonetheless, we have reduced the impervious coverage to alleviate this concern.

Daniel Dragani, P.E., Engineering Solutions Group, October 13, 2026, PDF, opens in a new tab

Utilities and service connections

Concern

Utilities are not shown. Separate sewer and water service connections are required for each unit.

Lisa E. DeMeo, P.E., City Engineer, July 24, 2026, PDF, opens in a new tab

Answer

NEW 1" COPPER WATER, TYP.

NEW 6" SDR 35 PVC, TYP.

CUT AND CAP EX. SEWER SERVICE AT MAIN

CUT AND CAP EX. WATER SERVICE AT CORP

Revised conceptual civil site plan, sheet 3, October 13, 2026, PDF, opens in a new tab

Conflict with an existing tree

Answer

The proposed utilities have been relocated away from the tree to avoid any potential conflicts.

Daniel Dragani, P.E., Engineering Solutions Group, October 13, 2026, PDF, opens in a new tab

Erosion control

Answer

The erosion control limits have been added to the plan along with details. The additional details and notes will protect the construction area appropriately.

Daniel Dragani, P.E., Engineering Solutions Group, October 13, 2026, PDF, opens in a new tab

Landscaping

Concern

comments were received from the various city departments regarding … compliance with stormwater and landscaping requirements in Section 6.3 of the Haverhill Zoning Ordinance

City comments, as the applicant’s attorney restates them, October 15, 2026, PDF, opens in a new tab

Answer

The Applicant will plant four street trees along the frontage of the property along with additional landscaping, as well as additional tree plantings in the rear yard to provide shade and attractive vegetation in association with the Project.

Jonathan R. Stark-Sachs, Johnson & Borenstein, LLC, October 15, 2026, PDF, opens in a new tab

Fire protection

Concern

An NFPA 13 compliant sprinkler system shall be required for this project. Each unit is to have its own feed.

Robert Irvine, Fire Department, July 21, 2026, PDF, opens in a new tab

Answer

The project will comply with all applicable provisions of the Massachusetts State Building Code (780 CMR), the Massachusetts Comprehensive Fire Safety Code (527 CMR), M.G.L. Chapter 148, and all conditions of the Haverhill Fire Department, including the installation of an NFPA 13 automatic sprinkler system.

Matt Silva, the applicant, July 22, 2026, PDF, opens in a new tab
27 Marshland St, Haverhill, MA on OpenStreetMap, opens in a new tab

The hearing

  1. Tuesday, July 28, 2026

    Hearing for September 15, 2026

    10 yeas, 0 nays, 1 absent

  2. Tuesday, September 15, 2026

    Continue to October 6, 2026

    11 yeas, 0 nays, 0 absent

  3. Tuesday, October 6, 2026

    Continue to October 20, 2026

    10 yeas, 0 nays, 1 absent

  4. Tuesday, October 20, 2026

    This sitting