Spending $316,044,835
Brandy Brow East Meadow River Culvert - Highway
Project replaces the existing, failing culvert with a structure that can accommodate larger storm flows, provides better protection against erosion and scour, reduces resident vulnerability to changing climatic conditions, and improves access across the East Meadow River for pedestrians and emergency personnel over the culvert. City applied for $1,000,000 in MassDOT grant funding in early 2026. No match required. City plans to apply for up to $650,000 in MassDER Culvert Replacement funding in March 2026. There is a 10% match requirement. 2024 project estimate attached. Maximize in-kind DPW services to reduce/eliminate local capital requirement.
Moderate — $65,000